PROJECTS - COMPLETED

SL.NO

CLIENT

PROJECT

LOCATION

SCOPE

1

Elster Instromet , Abu Dhabi

Year : 2011/12

Upgradation of Existing supervisory system in Swaihat power station

Abu Dhabi

1) Metering panel replacement.
2) Flow computer installation
3) UPS power supply installation for the flow computer.
4)Cable laying, glanding and termination
5)Fiber cabling and splicing, termination and testing works

2

ALSTOM

Year : 2011/12

TDG Substation 2006-2008 at GLF

Dubai

GIS installation, cable termination , testing and commissioning assistance

3

Miraj Instrumentation - L/T

Year : 2012/13

Fiber optic splicing, Termination and testing works HRS pipe line project

Abu Dhabi

Fiber optical splicing, termination and OTDR testing works

4

Al Mahasin Electromechanical Contracting Co. LLC

Year : 2013

LV &MV Termination works for Shah Gas development

Abu Dhabi

LV and MV cable splicing and termination works

5

ALSTOM

Year : 2013

400 KV Substation at Asab and Shah gas development

Shah/ASAB

MV switch Gear installation, cable termination , testing and commissioning assistance

6

Larson and Toubro LTD E&C Division- Abu Dhabi

Year : 2013

SGD -05 Gas pipe line project Fiber optical works

Shah/Habshan

Fiber cable splicing, termination and testing

7

Elster Instromet , Abu Dhabi

Year : 2013

Spare Gas Chromatograph Installation works

DUBAI/DUBAL

Installation of GC including shelter works, Cabling, Fiber splicing and termination, Control panel modification, Tubing and pre commissioning works.

8

Larson and Toubro LTD, E&C Division- Abu Dhabi

Year : 2013

HRS Glanding and Termination works skilled resources supply

Habshan/Ruwais

Cable glanding, termination and testing

9

Elster Instromet , Abu Dhabi

Year : 2013

Gas Chromatograph Installation works at DEWA

DUBAI/DEWA

Installation of GC including shelter works, Cabling, flow computer installation, Field instruments installation, Tubing and pre commissioning works

10

Emirates National construction and project management establishment

Year : 2013

Fire Alarm system replacement works at suction valve stations at Maqta Taweelah pipe line

Abu Dhabi/Dolphin Energy

Replacement of Fire Alarm panel, MCP, Smoke detector, Beacon and sounders in Hazardous area.

11

Emirates National construction and project management establishment

Year : 2013

Solar Battery replacement, testing and commissioning works

Abu Dhabi/Dolphin Energy

Replacement of batteries, testing and commissioning including old battery disposal.

12

Danway Electromechanical Engineering LLC

Year : 2013

Fiber optic splicing, Termination and testing works at Shah gas development project

Abu Dhabi

Fiber optical splicing, termination and OTDR testing works

13

Elster Instromet, Abu Dhabi

Year : 2013

Supply and installation of all mechanical spools and electrical and instrumentation works for Gas Metering system at Umal Nar Refinery at Sas Al Nakhil Island

Umm Al Nar Refinery/Arabian power company

Detail engineering, Supply and installation of new upstream and downstream spool pieces and GASCO Tie in. PT and TT supply and installation. FMC flow meter and flow computer installation and cabling of the complete metering system

14

Dodsal Engineering and Construction Pvt. Ltd

Year : 2013

Shah Gas Developments (Package 2 & 3) Project

Shah

Installation of cable tray and supports

15

Danway Electromechanical Engineering LLC

Year : 2013

Fiber optic splicing, Termination and testing works at Shah gas development project

Abu Dhabi

Fiber optical splicing, termination and OTDR testing works

16

Technicas Reunidas

Year : 2013

EPC for Shah Gas Gathering project

Shah

Fiber optical splicing, termination and OTDR testing works

17

National Engineering services and Trading LLC

Year : 2013

Control panel modification at Takreer Refinery

Ruwais

Control panel modification works and cable glanding and termination.

18

Falcor Engineering and contracting services

Year : 2014

Civil works for EMAL filtration system black powder management project

EMAL/Tawellah

Complete civil works for EMAL filter replacement project including procurement and construction which include foundation for filters, pipe slippers, miscellaneous civil works

19

Elster Instromet, Abu Dhabi

Year : 2014

Gas Chromatograph Installation works at Dolphin Energy

DUBAI/DEWA

Installation of GC including shelter works, Cabling, Fiber splicing and termination, Control panel modification, Tubing and pre commissioning works

20

M/S.  INABENSA Abu Dhabi - BH

Year : 2014

SHAH - Gas Gathering Project

Shah Gas

Fiber splicing, termination and testing works.

21

Falcor Engineering and contracting services

Year : 2014

Civil works for EMAL filtration system black powder management project

EMAL/Taweelah

Complete civil works for EMAL filter replacement project including procurement and construction which include foundation for filters, pipe slippers, miscellaneous civil works

22

M/S.  INABENSA Abu Dhabi - BH

Year : 2014

SHAH - Gas Gathering Project

Shah Gas

Fiber splicing, termination and testing works.

23

Emirates National construction and project management establishment

Year : 2014

Passive Shelter cooling coil replacement works at 4 SV stations at Dolphin energy.

Abu Dhabi/Dolphin Energy

Replacement of Cooling coil and glycol and demineralized water replacement works at 4 No of passive shelters at Dolphin energy SV stations

24

Technicas Reunidas

Year : 2014

EPC for Shah Gas Gathering project

Shah

Fiber optical splicing, termination and OTDR testing works

25

Danway Electromechanical Engineering LLC

Year : 2014

Fiber optic splicing, Termination and testing works at Abu Dhabi Airport Mid Field Terminals

Abu Dhabi

Fiber optical splicing, termination and OTDR testing works

26

Technicas Reunidas

Year : 2014

EPC for Shah Gas Gathering project

Shah

Fiber optical splicing, termination and OTDR testing works

27

Elster Instromet, Abu Dhabi

Year : 2014

Gas Chromatograph up gradation project

OMAN

  • Supply of all accessories to upgrade GC system.
  • Supply includes NRV’s, Filters, Flow meters, sampling system Skid, Heated regulator.
  • The installation includes only the preparation of Skid and delivery of the same with proper packing.

28

HEXA oil and gas

Year : 2014

Supply, Installation and commissioning of SMATV

Zirku Island

Supply and installation and commissioning of SMAT TV system at ZADCO- Zirku Island.

29

EMCO/FABCON

Year : 2014

GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal E& I Works

Habshan

The scope of work includes the supply of Exd JB’s and tubing and cables.

The installation scope covers cabling and tubing installation of JB’s, supports, glanding and termination works for 4 dry gas skids. 

30

EMCO/FABCON

Year : 2014

GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal Civil Works

Habshan

Excavation of 4 no of Heater cable trench/Branch cable trench for the skid/Heater panel foundation for Skid including concrete surface core cutting, demolition of concrete, preparation of trench by opening the existing trench

Supply and installation of all materials for foundation for the heater panel as per GASCO requirement

31

EMCO/FABCON

Year : 2015

Relocation of Flare Thermocouples 571-ME-103 ACID GAS FLARE

Habshan-5

Disconnection of thermocouple cables and removal of existing thermocouple. Installation of new thermocouple and termination of cables at the 16th platform of hydrocarbon flare.

32

ROBTSTONE/ TAKREER

Year : 2015

Splicing of CCTV FOC along with the pipeline & SV stations

Abudhabi / Ruwais

Fiber optical splicing, termination and OTDR testing works

33

METROMAC

Year : 2015

GASCO Habshan NP 94/95 Retrofit Project - Tandem L Dry Gas Seal - Civil Works

Habshan-0

Concrete works, Chipping & Installation of heater panels with J bolt. Concrete fixing form work and pouring of skid base grouting.

34

Emirates National construction and project management establishment

Year : 2015

Al Ain Station 230V AC UPS Replacement, testing and commissioning works

Abu Dhabi/Dolphin Energy

Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal.

35

Flowserve/ GASCO

Year : 2014

GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal Civil Works

Habshan

Supply of materials and modification of existing MCC panel to match the heater panel power requirement including protection facilities as per GASCO requirements

36

Robtstone / Dolphin Energy

Year : 2015

Agreement No. NO-UOP-193: EPC for TFP/AFP Interconnecting Meters

Abu Dhabi

Electrical & Instrumentation Construction Works

37

Robtstone/GASCO

Year : 2014

NGV filling Station Phase II

Ruwais / Al Ain

Supply and installation of Raised Floor for E&I Room.

38

Samsung Engineering/ Al Hosn Gas

Year : 2015

FOC Splicing & testing works

Shah

Fiber Optic Cable Splicing, OTDR testing & Troubleshooting of FOIDS system

39

GS Engineering & Construction/ TAKREER

Year : 2015

Takreer Inter Refinery Pipeline-2 ,Battery Charging/recharging  works

Abu Dhabi/Ruwais/Al Ain

Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal.

40

GS Engineering & Construction/ TAKREER

Year : 2015

Takreer Inter Refinery Pipeline-2, Battery Charging/recharging  works

Abu Dhabi/Ruwais/Al Ain

Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal.

41

Petrojet/GASCO

Year : 2015

YAS-MINA ZAYED Pipeline Project

Abu Dhabi

Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal.

42

Essar Constructions Overseas Limited/ GASCO

Year : 2015

Replacement of 16" Condensate Pipeline Project from Habshan to Ruwais of Gasco

Ruwais/Habshan

Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal.

43

Flowserve/GASCO

Year : 2016

EPC FOR DRY GAS SEAL FOR ASAB-COMPRESSORS 22K-102 & 24K-201

 

Habshan

Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal.

44

Robtstone/ADCO

Year : 2016

E&I Work for Hot oil Rehabilitation project

Abu Dhabi

Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal.

45

Robtstone

Year : 2016

Electrical engineering and construction of Habshan camp facilities.

Abu Dhabi

Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal.

PROJECTS - ONGOING

SL.NO

CLIENT

PROJECT

LOCATION

SCOPE

1

Robtstone/ADNOC

Year : 2014

EPC Work for Additional NGV filling stations.

Abu Dhabi

Engineering and construction for 13 no of NGV station in the existing ADNOC station and 1 new mother station at Al Faqqa- Al Ain

SERVICE ORDERS

SL.NO

CLIENT

PROJECT

YEAR

LOCATION

SCOPE

1

FATA SPA

TRANSFORMER OIL FILTRATION WORKS

2017

Abu Dhabi

1) Evacuation of existing Oil in Transformer
2) BDV Checking of existing Oil
3) Oil Filtration
4) Oil Filling into Transformer
5) Top up of required oil in Transformer
6) Final Circulation of the total Oil 

2

GS ENGINEERING

TRANSFORMER OIL FILTRATION WORKS

2017

Abu Dhabi

1) Evacuation of existing Oil in Transformer
2) BDV Checking of existing Oil
3) Oil Filtration
4) Oil Filling into Transformer
5) Top up of required oil in Transformer
6) Final Circulation of the total Oil 

 

News & Events



 

 
for more information Contact
Galaxy Energy Contracting W.L.L



Bahrain
Tel:+971 2 4466151
Fax:+971 2 4466121
email: [email protected]