SL.NO |
CLIENT |
PROJECT |
LOCATION |
SCOPE |
1 |
Elster Instromet , Abu Dhabi
Year : 2011/12 |
Upgradation of Existing supervisory system in Swaihat power station |
Abu Dhabi |
1) Metering panel replacement.
2) Flow computer installation
3) UPS power supply installation for the flow computer.
4)Cable laying, glanding and termination
5)Fiber cabling and splicing, termination and testing works |
2 |
ALSTOM
Year : 2011/12 |
TDG Substation 2006-2008 at GLF |
Dubai |
GIS installation, cable termination , testing and commissioning assistance |
3 |
Miraj Instrumentation - L/T
Year : 2012/13 |
Fiber optic splicing, Termination and testing works HRS pipe line project |
Abu Dhabi |
Fiber optical splicing, termination and OTDR testing works |
4 |
Al Mahasin Electromechanical Contracting Co. LLC
Year : 2013 |
LV &MV Termination works for Shah Gas development |
Abu Dhabi |
LV and MV cable splicing and termination works |
5 |
ALSTOM
Year : 2013 |
400 KV Substation at Asab and Shah gas development |
Shah/ASAB |
MV switch Gear installation, cable termination , testing and commissioning assistance |
6 |
Larson and Toubro LTD
E&C Division- Abu Dhabi
Year : 2013 |
SGD -05 Gas pipe line project Fiber optical works |
Shah/Habshan |
Fiber cable splicing, termination and testing |
7 |
Elster Instromet , Abu Dhabi
Year : 2013 |
Spare Gas Chromatograph Installation works |
DUBAI/DUBAL |
Installation of GC including shelter works, Cabling, Fiber splicing and termination, Control panel modification, Tubing and pre commissioning works. |
8 |
Larson and Toubro LTD, E&C Division- Abu Dhabi
Year : 2013 |
HRS Glanding and Termination works skilled resources supply |
Habshan/Ruwais |
Cable glanding, termination and testing |
9 |
Elster Instromet , Abu Dhabi
Year : 2013 |
Gas Chromatograph Installation works at DEWA |
DUBAI/DEWA |
Installation of GC including shelter works, Cabling, flow computer installation, Field instruments installation, Tubing and pre commissioning works |
10 |
Emirates National construction and project management establishment
Year : 2013 |
Fire Alarm system replacement works at suction valve stations at Maqta Taweelah pipe line |
Abu Dhabi/Dolphin Energy |
Replacement of Fire Alarm panel, MCP, Smoke detector, Beacon and sounders in Hazardous area. |
11 |
Emirates National construction and project management establishment
Year : 2013 |
Solar Battery replacement, testing and commissioning works |
Abu Dhabi/Dolphin Energy |
Replacement of batteries, testing and commissioning including old battery disposal. |
12 |
Danway Electromechanical Engineering LLC
Year : 2013 |
Fiber optic splicing, Termination and testing works at Shah gas development project |
Abu Dhabi |
Fiber optical splicing, termination and OTDR testing works |
13 |
Elster Instromet, Abu Dhabi
Year : 2013 |
Supply and installation of all mechanical spools and electrical and instrumentation works for Gas Metering system at Umal Nar Refinery at Sas Al Nakhil Island |
Umm Al Nar Refinery/Arabian power company |
Detail engineering, Supply and installation of new upstream and downstream spool pieces and GASCO Tie in. PT and TT supply and installation. FMC flow meter and flow computer installation and cabling of the complete metering system |
14 |
Dodsal Engineering and Construction Pvt. Ltd
Year : 2013 |
Shah Gas Developments (Package 2 & 3) Project |
Shah |
Installation of cable tray and supports |
15 |
Danway Electromechanical Engineering LLC
Year : 2013 |
Fiber optic splicing, Termination and testing works at Shah gas development project |
Abu Dhabi |
Fiber optical splicing, termination and OTDR testing works |
16 |
Technicas Reunidas
Year : 2013 |
EPC for Shah Gas Gathering project |
Shah |
Fiber optical splicing, termination and OTDR testing works |
17 |
National Engineering services and Trading LLC
Year : 2013 |
Control panel modification at Takreer Refinery |
Ruwais |
Control panel modification works and cable glanding and termination. |
18 |
Falcor Engineering and contracting services
Year : 2014 |
Civil works for EMAL filtration system black powder management project |
EMAL/Tawellah |
Complete civil works for EMAL filter replacement project including procurement and construction which include foundation for filters, pipe slippers, miscellaneous civil works |
19 |
Elster Instromet, Abu Dhabi
Year : 2014 |
Gas Chromatograph Installation works at Dolphin Energy |
DUBAI/DEWA |
Installation of GC including shelter works, Cabling, Fiber splicing and termination, Control panel modification, Tubing and pre commissioning works |
20 |
M/S. INABENSA Abu Dhabi - BH
Year : 2014 |
SHAH - Gas Gathering Project |
Shah Gas |
Fiber splicing, termination and testing works. |
21 |
Falcor Engineering and contracting services
Year : 2014 |
Civil works for EMAL filtration system black powder management project |
EMAL/Taweelah |
Complete civil works for EMAL filter replacement project including procurement and construction which include foundation for filters, pipe slippers, miscellaneous civil works |
22 |
M/S. INABENSA Abu Dhabi - BH
Year : 2014 |
SHAH - Gas Gathering Project |
Shah Gas |
Fiber splicing, termination and testing works. |
23 |
Emirates National construction and project management establishment
Year : 2014 |
Passive Shelter cooling coil replacement works at 4 SV stations at Dolphin energy. |
Abu Dhabi/Dolphin Energy |
Replacement of Cooling coil and glycol and demineralized water replacement works at 4 No of passive shelters at Dolphin energy SV stations |
24 |
Technicas Reunidas
Year : 2014 |
EPC for Shah Gas Gathering project |
Shah |
Fiber optical splicing, termination and OTDR testing works |
25 |
Danway Electromechanical Engineering LLC
Year : 2014 |
Fiber optic splicing, Termination and testing works at Abu Dhabi Airport Mid Field Terminals |
Abu Dhabi |
Fiber optical splicing, termination and OTDR testing works |
26 |
Technicas Reunidas
Year : 2014 |
EPC for Shah Gas Gathering project |
Shah |
Fiber optical splicing, termination and OTDR testing works |
27 |
Elster Instromet, Abu Dhabi
Year : 2014 |
Gas Chromatograph up gradation project |
OMAN |
- Supply of all accessories to upgrade GC system.
- Supply includes NRV’s, Filters, Flow meters, sampling system Skid, Heated regulator.
- The installation includes only the preparation of Skid and delivery of the same with proper packing.
|
28 |
HEXA oil and gas
Year : 2014 |
Supply, Installation and commissioning of SMATV |
Zirku Island |
Supply and installation and commissioning of SMAT TV system at ZADCO- Zirku Island. |
29 |
EMCO/FABCON
Year : 2014 |
GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal E& I Works |
Habshan |
The scope of work includes the supply of Exd JB’s and tubing and cables.
The installation scope covers cabling and tubing installation of JB’s, supports, glanding and termination works for 4 dry gas skids. |
30 |
EMCO/FABCON
Year : 2014 |
GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal Civil Works |
Habshan |
Excavation of 4 no of Heater cable trench/Branch cable trench for the skid/Heater panel foundation for Skid including concrete surface core cutting, demolition of concrete, preparation of trench by opening the existing trench
Supply and installation of all materials for foundation for the heater panel as per GASCO requirement |
31 |
EMCO/FABCON
Year : 2015 |
Relocation of Flare Thermocouples 571-ME-103 ACID GAS FLARE |
Habshan-5 |
Disconnection of thermocouple cables and removal of existing thermocouple.
Installation of new thermocouple and termination of cables at the 16th platform of hydrocarbon flare. |
32 |
ROBTSTONE/ TAKREER
Year : 2015 |
Splicing of CCTV FOC along with the pipeline & SV stations |
Abudhabi / Ruwais |
Fiber optical splicing, termination and OTDR testing works |
33 |
METROMAC
Year : 2015 |
GASCO Habshan NP 94/95 Retrofit Project - Tandem L Dry Gas Seal - Civil Works |
Habshan-0 |
Concrete works, Chipping & Installation of heater panels with J bolt. Concrete fixing form work and pouring of skid base grouting. |
34 |
Emirates National construction and project management establishment
Year : 2015 |
Al Ain Station 230V AC UPS Replacement, testing and commissioning works |
Abu Dhabi/Dolphin Energy |
Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal. |
35 |
Flowserve/ GASCO
Year : 2014 |
GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal Civil Works |
Habshan |
Supply of materials and modification of existing MCC panel to match the heater panel power requirement including protection facilities as per GASCO requirements |
36 |
Robtstone / Dolphin Energy
Year : 2015 |
Agreement No. NO-UOP-193: EPC for TFP/AFP Interconnecting Meters |
Abu Dhabi |
Electrical & Instrumentation Construction Works |
37 |
Robtstone/GASCO
Year : 2014 |
NGV filling Station Phase II |
Ruwais / Al Ain |
Supply and installation of Raised Floor for E&I Room. |
38 |
Samsung Engineering/ Al Hosn Gas
Year : 2015 |
FOC Splicing & testing works |
Shah |
Fiber Optic Cable Splicing, OTDR testing & Troubleshooting of FOIDS system |
39 |
GS Engineering & Construction/ TAKREER
Year : 2015 |
Takreer Inter Refinery Pipeline-2 ,Battery Charging/recharging works |
Abu Dhabi/Ruwais/Al Ain |
Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal. |
40 |
GS Engineering & Construction/ TAKREER
Year : 2015 |
Takreer Inter Refinery Pipeline-2, Battery Charging/recharging works |
Abu Dhabi/Ruwais/Al Ain |
Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal. |
41 |
Petrojet/GASCO
Year : 2015 |
YAS-MINA ZAYED Pipeline Project |
Abu Dhabi |
Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal. |
42 |
Essar Constructions Overseas Limited/ GASCO
Year : 2015 |
Replacement of 16" Condensate Pipeline Project from Habshan to Ruwais of Gasco |
Ruwais/Habshan |
Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal. |
43 |
Flowserve/GASCO
Year : 2016 |
EPC FOR DRY GAS SEAL FOR ASAB-COMPRESSORS 22K-102 & 24K-201
|
Habshan |
Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal. |
44 |
Robtstone/ADCO
Year : 2016 |
E&I Work for Hot oil Rehabilitation project |
Abu Dhabi |
Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal. |
45 |
Robtstone
Year : 2016 |
Electrical engineering and construction of Habshan camp facilities. |
Abu Dhabi |
Replacement of AC UPS, Batteries, testing and commissioning including old battery disposal. |